It is pretty much non-stop except for weather and the infrequent mechanical breakdown’s that occur. It’s Not All About Dredging!Īs the dredge season goes, the majority of the time is spent on the project location setting up, dredging and then breaking down and moving onto the next project. The Pre-Dredge survey plan for Allen Harbor.

Dredging continued throughout the week up until Saturday when dense fog initially postponed operations then wind / seas from the west/southwest restricted dredging operations. There are several discharge locations designated by the town of Harwich including Grey Neck Beach and several private residences. Published on: JSand Shifter – Allen Harbor Channel, Harwichĭredging started on June 1st with the Sand Shifter working just outside of the east breakwater in the entrance to Allen Harbor.